- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
料仓球型网架监理实施细则(国外英文资料)
料仓球型网架监理实施细则(国外英文资料)
, the detailed rules for the implementation
The supervisor should be careful
One, engineering situation:
Project name: shanxi luan group coal base clean and oil thermal integration demonstration project
Unit engineering name: solid storage and transportation equipment silo ball type network frame project
Construction unit: shanxi luan coal base clean energy company
Design unit: hua electric heavy industry co., LTD
Construction unit: hua electric heavy industry co., LTD
Supervisor: shanxi coal construction supervision and consulting company
Engineering site: wang qiao town, xiangan county
Project introduction: shanxi LuAn clean oil to make use of high sulphur coal electric integrated demonstration project solid materials storage and transportation devices bunker ball rack project, is located in xiangyuan county of changzhi city, Shanxi Province king bridge town, guos villa.
Second, according to the standard
Should meet the national standards:
Evaluation criteria for quality inspection of steel structure engineering gb5021-95
Design and construction of web shelf structure engineering jgj7-91
Bolt-ball node (jgj75.1-91)
Bolt ball node (JGJ75.2-91)
Evaluation criteria for quality inspection of network shelf structures
Third, supervisory measures
(1) quality control measures
The supervisory personnel of the field are familiar with the steel structure process, the technical requirements of steel structure construction and the quality acceptance specification, and are familiar with the construction drawings.
2, the construction unit must strictly carry out material approach, inspection system and the system of witness sampling, all in the documents and materials must provide complete quality by the field test, inspection and signed by the supervisors of qualified rear can use.
3, strictly implement the system of process inspection, after completion of each procedure, construction units of qualified self-checking, submitted to the acceptance supervisio
文档评论(0)