- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
桥梁台背回填施工计划(水密法) Microsoft Office Word 文档(国外英文资料)
桥梁台背回填施工方案(水密法) Microsoft Office Word 文档(国外英文资料)
directory
A, the engineering general situation... 2
Second, the mechanical combination and personnel configuration of the proposed investment... 2
Three, construction technology... 3
Four, construction points for attention... 5
Five, the quality assurance measures... 5
Six, safety guarantee measures... 6
Seven, environmental protection... 6
Technical plan for backfilling construction of bridge table
(watertight method)
First, the general situation of the project
The backfilling of the bridge is a special project, and it is important to ensure the quality of the project and prevent the jumping of the bridge. Meida high speed 1 has a total of four Bridges, and 10 of the bridge is needed for backfilling of the platform, and the design USES stone dust as the back packing.
The main project quantity is the following table
The serial number
The project name
The abutment type
Post-stage backfill (m3)
Sticky soil (m3)
Element C15 concrete layer (m3)
one
The triangle overpass 35 #
buttress
1129.9
173.1
49
2
The zhanglong stands at 0 # tai
pillar
264.2
49.6
24.5
3
The zhanglong stands at 53 #
rib
3005.8
227.9
49
4
The left line of the PAM bridge is zero #
pillar
190.9 *
63.5
12.5
5
The left line of the panpit bridge is 16 #
pillar
190.9
63.5
12.5
6
The right line of the panpit bridge is zero #
pillar
190.9
63.5
12.5
7
The right line of the panpit bridge is 15 #
pillar
190.9
63.5
12.5
8
The left line of the bridge is 8 #
pillar
217.5
69.4
12.5
9
Lower right side of the bridge is 0 #
pillar
217.5
69.4
12.5
10
The lower right side of the bridge is 11 #
pillar
217.5
69.4
12.5
The mechanical combination and personnel configuration of the proposed investment
1, the site manager, the construction personnel are equipped with the watch
The serial number
The name
position
The number of
note
one
Shen siao
The head of the roadbed construction
one
2,
Lai Chengzhong
The head of the experimental technology
one
3,
luo
The operator
one
3,
ZhanJ
您可能关注的文档
最近下载
- 提高择期手术患者术前准备完善率医院护理品管圈QCC成果汇报PPT(完整版本易修改).pptx VIP
- B-65522CM_01-αi-B βi-B 伺服电机规格.pdf VIP
- 采购部员工年终总结.pptx VIP
- 《老年人能力评估从业人员培训指南》.pdf
- 二年级道德与法治上册-全册教案-新人教版.pdf VIP
- 投资项目风险因素识别核对表.docx
- CAAC无人机理论考试题库(2025修订版)含答案.docx VIP
- DB11∕T 512-2024 建筑装饰工程石材应用技术规程.pdf
- Unit1 单元整体教学设计-小学英语五年级上册(人教PEP版).docx VIP
- CAAC无人机理论考试题库(2025修订版)含答案.docx VIP
文档评论(0)