沙河充水试验槽底挠度监测实施计划--终(国外英文资料).docVIP

沙河充水试验槽底挠度监测实施计划--终(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
沙河充水试验槽底挠度监测实施计划--终(国外英文资料)

沙河充水试验槽底挠度监测实施方案--终(国外英文资料) Water test in the first phase of the middle line of the south-to-north water diversion The design of the bottom deflection of beam aqueduct is carried out The Yellow River survey planning design co., LTD. Is the project department of sha river In March 2014, 6 Review: li hai river Check: guo zhigang li yingchun Written: wen shuai zhu wenchang Li Lin bo Yang Orders to record 1 task comes from 1 2 deflection monitoring work contents 1 Monitor implementation plan 1 3.1 is based on 1 Resource allocation 1 Observation 2 3.4 data collation and analysis 3 4 to submit results of 3 The amount of work is calculated by 4 6 safety measures 5 1 the other task According to the shahe aqueduct water filling test for the fifth time to coordinate meeting minutes (flat and straight worker minutes [2014] no. 3) requirements, the observation conditions of aqueduct aqueduct deflection monitoring. 2 deflection monitoring work content Condition monitoring of the beam aqueduct for 3 ~ 24 across, shahe beam aqueduct big LangHe 3 ~ 6 cross beam aqueduct, a total of 26 across, 104 common slot, the deflection observation for 104 common slot of the deflection monitoring. Monitor implementation plan 3.1 compilation basis (1) the fifth coordination meeting of the sha river aqueduct test (1) the minutes of the meeting of the coordinators meeting (in the same way) (2) technical specifications for safety monitoring of concrete DAMS (DL/T5178-2003) (3) the technical specifications for the safety monitoring of the earth rock dam (sl60-94) (4) the regulations of the state one and second level standards (GB12897-2006) (5) the measures for measuring water and hydropower engineering (sl197-97). 3.2 the allocation of resources The configuration of the main instrument The main instrument equipment is equipped with a list The serial number Instrument name specifications unit The number of note one Total station Leica TS30 Taiwan one / 2 Steel tape 5 m. the 2 / 3 Convergence meter

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档