溷凝土缺点处理施工计划(国外英文资料).docVIP

溷凝土缺点处理施工计划(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
溷凝土缺点处理施工计划(国外英文资料)

溷凝土缺陷处理施工方案(国外英文资料) Guangzhou yuncheng media village in the southern district of concrete defect treatment construction scheme The formulation of the instructions In the construction phase of the main structure, some concrete and concrete diseases are presented, and the prevention and treatment of concrete quality of concrete and concrete is a key part of improving the quality of the project. In view of some of the present problems of concrete quality in the present project, this scheme is put forward, and the prevention measures and treatment methods are put forward. Common quality and prevention measures (1) the concrete honeycomb, 1, reasons: (1) the surface roughness and with dry concrete and water wet enough before pouring concrete, or template be not strict, cast, some concrete water loss too much contact with the template or slippery pulp, concrete and dry state, make the concrete surface to form many small pits. (2) the mixing time of concrete is short, the amount of water is not allowed, the concrete and the easy sex are poor, and the concrete is poured into the concrete after the concrete has been cast, and the mortar is more than gravel, forming a hive. (3) the concrete water is not layered and watered, and it is not properly made, causing the concrete to isolate and thus the beehive. (4) when the concrete is cast in poor quality or leakage, the honeycomb is caused. 2, preventive measures: (1) carefully before placing of concrete template firmly and examine whether the gap wall is good, the template should be clean with clear water wet, no water, and make the template crack expansion. (2) the concrete mixing time should be suitable, usually 1-2 minutes. (3) when concrete is poured over two meters, measures should be taken, such as using a series of tubes, tubes or vibrating tubes. (4) when the concrete is in the mold, the time must be mastered, usually about 20 to 30 seconds per hour. Proper vibrating time can be determine by the following phenomena: no

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档