12河北定额土石方部分说明与计量规则(国外英文资料)
12河北定额土石方部分说明与计量规则(国外英文资料)
A. soil, stone work
instructions
1, the classification of soil and rocks is detailed in this chapter, the soil and the rocks (pushi) in the rules of the calculation of the quantity of engineering in this chapter.
The soil project is based on the basis of the newly formulated, dry and wet soil, which is the wet soil when the water rate is greater than 25%. When the earth is wet, the coefficient is 1.18; Artificial, mechanical times factor 1.15 when the machine is excavated.
The division of the geotechnical project related projects:
1. The earthwork
: flat ground level ground refers to the thickness of the in situ within plus or minus 30 ㎝ digging and filling and leveling; The earth and the stone square of the above range shall be calculated by the excavated soil and the stone.
Earth: digging in more than 30 ㎝ thickness and bottom area in more than 20 ㎡ digging for excavation.
Groove: the bottom width of the trough is within 3m, and the groove is raised in the groove by three times the width of the groove.
The bottom of the pit: area within 20 ㎡ digging to dig a pit.
Silt: a viscous earth deposited in a stagnant or slow-moving water environment and formed by biochemical action.
Flow sand: earthwork construction, when earthwork digging below the underground water level, ground and lateral soil formation flow state, sometimes together with the underground soil, the phenomenon is the phenomenon of sand flow, the sand is called flow sand.
The stone project:
Pinkie, groove bottom outside of 3 m wide, the pit area outside the 20 ㎡ for flat base.
Groove: the bottom of the groove is within 3m, and the groove is raised in the groove by three times the width of the groove.
The bottom of the pit: within 20 ㎡ area for the foundation pit.
In the case of the blasting of the rock, the design requires a thorough pasting of the base to meet the design requirements.
Trim the slope: trim the slope of the stone and clear the slag.
It shall be calculated separat
您可能关注的文档
最近下载
- 高中政治课件:1-1-1公有制主体地位及其体现.pptx
- 语文三上练习题第四单元测试卷.doc VIP
- 电子商务客户服务(周艳红第二版) 教案全套 项目1-7.pdf VIP
- 贵州天眼介绍.pptx
- DELTA台达VFD-MS300精巧标准型向量控制变频器使用手册调试说明.pdf
- 农业银行面试题目及参考答案.pdf VIP
- 2022-2023学年济南市历城区八年级上学期期中数学试卷(含答案解析).docx
- 2024秋新北师大版物理八年级上册教学课件 第四章 光现象 第五节 设计舞台灯光秀 .pptx
- 危险废物的处理处置.ppt
- 《大数据挖掘与统计机器学习(第3版)》 课件全套 吕晓玲 第1--10章 概述、线性回归方法 ---循环神经网络和注意力机制.pptx
文档评论(0)