- 1、本文档共27页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
09造价员理论试题及答案(国外英文资料)
09造价员理论试题及答案(国外英文资料)
Theory and answer of construction project cost in jiangsu province in 2009
The basic theory of project cost
One, a single item of choice (total 40, 1 point for each question, 40 points. Each question
Of the alternatives, there is only one that is most conserved.
The classification of construction projects is in various forms, and the division of the construction USES is (B).
A. municipal infrastructure projects b. productive construction projects
C. self-financing construction project d. business construction project
In general industrial and civil construction projects, it is not possible to be part engineering (D).
A. building b. building c. roofing engineering
The construction unit shall, after receiving the construction permit, fail to start the work due to reason and should be sent to the post
The extension of the application shall not exceed (B) the longest extension of the project.
A: three months b. six months c. nine months d. twelve months
As to the characteristics of the project cost, the following statement is incorrect (B).
A. the large scale of the cost of the project makes it A great influence on the macroeconomy
B. the difference in the product depends on the individual differences in the cost of the project
C. the cost of the project is in an uncertain state throughout the construction period until it is completed
The actual cost of the project will be determined after the final calculation
D. the compatibility of the project cost is first shown in its two meanings, second
The extensive and complicated factors of the construction cost
According to the construction departments management measures for project cost, the construction of grade b
It is (D) that the consulting firm does the construction cost consultancy.
A.Only in this province is engaged in the construction cost advisory business
B. not subject to the size of the administrative region and the construction cost
C. Only in this province is engaged in the construction co
您可能关注的文档
- 16秋北交《人力资源统计学》在线作业一(国外英文资料).doc
- 13春《行政案例分析》在线作业(国外英文资料).doc
- (密)万科房地产成本(软件应用)(国外英文资料).doc
- 12河北定额土石方部分说明与计量规则(国外英文资料).doc
- 0地理1(国外英文资料).doc
- 0814号强台风_黑格比_路径及降水分析(国外英文资料).doc
- 16秋北交《汽车维修技术》在线作业一(国外英文资料).doc
- 16秋北交《继电保护技术》在线作业一(国外英文资料).doc
- 2.作业5350地域文化(国外英文资料).doc
- 2006年广州市中学生高一化学竞赛章程 target=_blank(国外英文资料).doc
最近下载
- 高中政治课件:1-1-1公有制主体地位及其体现.pptx
- 语文三上练习题第四单元测试卷.doc VIP
- 电子商务客户服务(周艳红第二版) 教案全套 项目1-7.pdf VIP
- 贵州天眼介绍.pptx
- DELTA台达VFD-MS300精巧标准型向量控制变频器使用手册调试说明.pdf
- 农业银行面试题目及参考答案.pdf VIP
- 2022-2023学年济南市历城区八年级上学期期中数学试卷(含答案解析).docx
- 2024秋新北师大版物理八年级上册教学课件 第四章 光现象 第五节 设计舞台灯光秀 .pptx
- 危险废物的处理处置.ppt
- 《大数据挖掘与统计机器学习(第3版)》 课件全套 吕晓玲 第1--10章 概述、线性回归方法 ---循环神经网络和注意力机制.pptx
文档评论(0)