09造价员理论试题及答案(国外英文资料).doc

09造价员理论试题及答案(国外英文资料).doc

  1. 1、本文档共27页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
09造价员理论试题及答案(国外英文资料)

09造价员理论试题及答案(国外英文资料) Theory and answer of construction project cost in jiangsu province in 2009 The basic theory of project cost One, a single item of choice (total 40, 1 point for each question, 40 points. Each question Of the alternatives, there is only one that is most conserved. The classification of construction projects is in various forms, and the division of the construction USES is (B). A. municipal infrastructure projects b. productive construction projects C. self-financing construction project d. business construction project In general industrial and civil construction projects, it is not possible to be part engineering (D). A. building b. building c. roofing engineering The construction unit shall, after receiving the construction permit, fail to start the work due to reason and should be sent to the post The extension of the application shall not exceed (B) the longest extension of the project. A: three months b. six months c. nine months d. twelve months As to the characteristics of the project cost, the following statement is incorrect (B). A. the large scale of the cost of the project makes it A great influence on the macroeconomy B. the difference in the product depends on the individual differences in the cost of the project C. the cost of the project is in an uncertain state throughout the construction period until it is completed The actual cost of the project will be determined after the final calculation D. the compatibility of the project cost is first shown in its two meanings, second The extensive and complicated factors of the construction cost According to the construction departments management measures for project cost, the construction of grade b It is (D) that the consulting firm does the construction cost consultancy. A.Only in this province is engaged in the construction cost advisory business B. not subject to the size of the administrative region and the construction cost C. Only in this province is engaged in the construction co

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档