- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土方检验批(国外英文资料)
土方检验批(国外英文资料)
Project quality check list
Table no. : DJH - A - 24 (98 edition) number: HF1 SDSF - BY - 095 - T002
The name of the project
A 2 by 300MW project in xinjiang and fengfeng power plant
Contract no.
J (2010) HF - 15
To the ministry of supervision of the first phase of the construction project of xinjiang and fengfeng power plant, northwest China construction supervision co., LTD.
Freight and electric door is a message to dig, earthwork test shipment of engineering has been completed construction tasks, and in accordance with the engineering inspection rules and the relevant standards and regulations for self-checking, quality grade for qualified, is submitted to the examination.
Attached: hidden project acceptance record
Contractor (chapter)
Professional engineer: December
General contractor review:
General contractor (chapter)
Professional engineer: December
Inspection of the project supervisor department:
Project supervisor department (chapter) :
Supervisory engineer: December
In the form of three copies of this table, the contractor shall fill in one copy and the contractor shall deposit two copies.
The earth shall excavate and verify the approval records of the batches
Table 5.3.1 number: 01-09-09 5-00-01-01-00-01-01
Unit (subunit)
The name of the project
Freight transfer room and electric door
Division (subdivision)
The name of the project
Foundations and basic engineering
Project name
Earthwork excavation
Acceptance of the parts
The foundation pit
The total package units
Shandong electric power engineering consulting co., LTD
The project manager
Zhou Baotian
Construction execution standard
The name and number
Part 1 of the quality inspection and assessment of electric power construction
Construction project DL/T5210.1-2005
Professional master
(the builder)
The bear safer
The construction of the team leader
Zhong Yongling
Construction unit
Shandong sifang installation engineering co., LTD
The project manager
Rights too jade
The rules for the acceptanc
原创力文档


文档评论(0)