- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土石方计量规则工程(国外英文资料)
土石方计量规则工程(国外英文资料)
First, the earthwork project
??
Say Ming?
First, artificial, mechanical earthstone:
Soil rocks are classified into soil and rock (por) classification lists.
The earths geosyncline (pit) and the earths soil, all dry soil and wet soil, carry out the quota.
The volume of earth and rock is calculated by the volume of natural compacted.
Water and water discharge in the work area during the construction period, including during the construction increase of winter monsoon; Other drainage costs are calculated according to the actual calculation.
Two, artificial earth stone square
1, when excavated the earth under the support of the retaining board, the volume of the actual excavated volume, the coefficient of artificial multiplying by the coefficient of 1.35, is not increased after the excavation.
When excavated the soil between the piles, artificial multiply by a factor of 1.25. In this case, excavations of the excavated piles are artificially multiplied by a factor of 1.10. The pile size greater than 600mm shall be deducted.
3, when the site is excavated to fill the earth, it is no longer possible to calculate the amount of flat site engineering.
The stone square blasting is made according to the method of the perforation of the perforation, which shall not be divided into the light and the fire, but the covering material of the smothered gun shall be calculated separately.
The blasting of the stone shall be prepared by the electric detonator and conductor conducting the detonation, such as when the detonator is blasting, the detonator should be converted, the quantity is the same. Deduct the plastic lead in the standard, change the fuse, the length of the fuse is calculated by each detonator 2.12 m.
Third, mechanical earthwork
1, the bulldozer is bulldozed, the slag, the scraper shovel the earth, and when the slope is greater than 5%, the distance is calculated by the following coefficient.
Slope (%)
5-10
Within 15
Within 20
Less than 25
The coefficient
您可能关注的文档
最近下载
- resform使用说明.doc
- 丙烯酸乳液标准文本.pdf VIP
- 《劳动权益保护法规》课件.ppt VIP
- 要素式强制执行申请书(申请执行用).docx VIP
- GEOMETRICAL OPTICS AND OPTICAL DESIGN (几何光学和光学设计).PDF VIP
- T_CSTE 0001—2021_污(废)水处理用碳源.pdf VIP
- 赣科技版信息科技七年级上册 第6课《网络创新应用》第2课时 教案.doc VIP
- 大型齿轮渐开线齿形误差在位测量仪(测控第一大组课程设计报告).docx VIP
- 人工智能助力文化创意产业增长分析报告.docx VIP
- 杉木人工林抚育经营技术规程.pdf VIP
原创力文档


文档评论(0)