钢结构屋架设计(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
钢结构屋架设计(国外英文资料)

钢结构屋架设计(国外英文资料) Course design of steel structure in civil 070341wang General steel roof design -- - welded trapezoid steel roof -design data 1, a single-layer single-span industrial plant with a total length of 102m with a span of 24m. 2, plant column from 6 m, reinforced concrete column, the strength grade of concrete C20, necking cross section is 400 mm * 400 mm, roof truss using trapezoidal steel roof truss, with its both ends hinged Yu Gangjin concrete column. The workshop has two intermediate working bridge cranes, one 150T, one 30T, and the platform elevation + 12000 m. Load standard value (horizontal projector level) : (1) permanent load: 2 felt 3 oil (spread green bean sand) waterproof layer 0.4 KN/m The cement mortar is leveling off by 0.4 KN/m2 The insulation layer 0.5 KN/m2 A felt oil layer 0.05 KN/m2 Prestressed concrete large roof plate 1.4 KN/m2 The roof and the supporting self weigh 0.384 KN/m2 (2) variable load: the standard value of roof living load is 0.7 KN/m2 The load standard is 0.35 KN/m2 The standard value of the ash load is 1.3 KN/m2 The measuring span of the roof, the geometry and the slope of the roof are shown The above image shows the computing span of the roof: Lo = 24000-2 times 150 = 23700mm, the end height: h = 1990mm (axis). The steel Q235 steel, the Angle steel, the steel plate various specifications complete; There are various types of welds and c-class bolts for use. 7, manufacturing, transportation and installation of steel roof conditions: in manufacturing metal structure factory, shipped to the site installation, length is 16 m, the largest transport transport height of 3.85 m, the site has enough hoisting installation conditions. Second, design content 1) the support system of the roof is set up (1) the concrete arrangement of the supporting system on the roof of the roof For the upper string plane, the horizontal support should be set in the first column between the two sides of the house, and in order to increase t

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档