- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
16 机电工程项目竣工验收(国外英文资料)
16 机电工程项目竣工验收(国外英文资料)
2 h320,000 mechanical and electrical engineering construction management practice
Construction of mechanical and electrical engineering project of 2H320130
2 h320131 the conditions for the construction of mechanical and electrical engineering projects are completed
Conditions for the acceptance of the completion of the project
(1) the classification of the acceptance of the completion of the project
Unit engineering (or professional engineering) is completed and inspected
The unit project of a construction contract alone shall be completed upon completion. In a unit project, the professional project that meets the requirements of the prescribed labor requirements shall be approved by the construction unit, which may be completed in stages or in the interim.
The project is completed and inspected
(2) documents for the completion of the examination and acceptance
Approved design documents, construction drawings and specifications.
The construction contract signed by both parties.
Equipment specification.
Design change notice.
Construction acceptance standards and quality acceptance standards.
(3) the basic conditions for the inspection and acceptance of the completion of the project shall be met
The design documents and the construction of the contract agreement have been completed.
Complete and approved project completion data.
Have the inspection, design, construction, supervision and other units sign the qualified documents.
Be able to use the main materials and equipment of the construction equipment and report the test report.
There are warranty books signed by construction units.
The requirements of the project acceptance must comply with the regulations
The quality standard of the contract.
The qualified standards for the inspection and acceptance of the unit project.
3.Individual projects meet the requirements of use or meet production requirements.
The construction project can meet the requirements of the construction of the project.
2
您可能关注的文档
最近下载
- 直线和圆的位置关系(全国优质课赛课公开课一等奖)课件-九年级数学新人教版上册.pptx VIP
- 标志抽象图形设计技法群化.ppt VIP
- 高考英语词汇3500电子版.pdf VIP
- 三相异步电动机说课.ppt VIP
- 圆的有关性质--圆(全国优质课赛课公开课一等奖)课件-九年级数学新人教版上册.pptx VIP
- 圆的有关性质--圆周角(全国优质课赛课公开课一等奖)课件-九年级数学新人教版上册.pptx VIP
- 圆的有关性质--垂直于弦的直径(全国优质课赛课公开课一等奖)课件-九年级数学新人教版上册.pptx VIP
- 界面砂浆、抗裂砂浆课件.doc VIP
- 《秘书沟通与协调》课件.ppt VIP
- 肠道菌群糖尿病及肥胖防治新靶点讲解学习.pptx VIP
原创力文档


文档评论(0)