- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
中心排水管、排水沟作业指导书(国外英文资料)
中心排水管、排水沟作业指导书(国外英文资料)
Report the material
Instruction book of central drain and drain
1, scope of application
This paper is applicable to the drainage and drainage of the drainage and drainage of the central drainage pipes in the yellow sand mouth of the lanxin railway. The lanxin railway tunnel is a level 1.
Drainage Settings and functions
In the tunnel, the drainage is used in double gutters or double-sided gutters and central ditches.
2 double side ditch ditch and center method, side ditch on both sides of sidewall foundation, it is mainly used for the groundwater and collected by transverse aqueduct led to the center of the ditch, and at the same time have the effect of precipitation and excluding some catchment, to prevent sedimentation jam, easy to check the maintenance, inspection shaft center ditch Settings.
(3) lateral aqueduct underneath their ballastleas track foundation pad, setting direction and perpendicular to the tunnel is connected to the lateral sulcus and center ditch water channel, transverse aqueduct spacing of 30 m, cooperate with the inspection well set up.
The center gutter is set in the middle of the tunneling, and is used to concentrate the groundwater that flows from the upstream line.
The center drain is 30 square to check the well. Inspect the well to assemble the horizontal guide and connect to the upstream and downstream center drain, and check the sink.
3, building materials
(1) central drain: triple tube (400 mm) diameter Φ
The ditches: C25 coagulates
(3) lateral aqueduct: Φ 100 mm rigid PVC pipe
Inspect well: C30 reinforced concrete
Construction process and process
Center drain and horizontal guide buried
The reserved channel
Check Settings
The elevation arch is ahead of the construction
Inspection qualified
Reserved channel fill
The lateral conduit is connected to the side trench
Lining and groove construction
(1) the overall train of thought
Before the drainage ditch and the side ditch in the construction center, the arch constr
您可能关注的文档
最近下载
- 年產6万吨环氧树脂工艺设计稿毕业设计稿.docx VIP
- 工业机器人工作站系统集成设计 电气电路设计 电气电路设计.pptx VIP
- 人工气道湿化的护理进展1).pdf VIP
- 最全剪映教程.pdf VIP
- 4亨通组织架构职责分工汇编.pdf VIP
- GMP 项目四:药品生产过程管理 项目四:药品生产过程管理.ppt
- 会计全套表格.xls VIP
- NB-T+10160-2019+炭化型煤NB-T+10160-2019+炭化型煤.docx VIP
- Chapter 12: 存在主义 与 文学Existentialism & Literature.ppt VIP
- 防性侵主题班会教案-防性侵主题班会教案小学生(共7页).docx VIP
原创力文档


文档评论(0)