关于争夺城镇基础举动办法培植资金的申报(国外英文资料).docVIP

关于争夺城镇基础举动办法培植资金的申报(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
关于争夺城镇基础举动办法培植资金的申报(国外英文资料)

关于争取城镇基础设施建设资金的报告(国外英文资料) On the struggle for urban infrastructure construction Moneys report Housing and urban-rural development: In order to speed up my town construction of small towns in * * * of the party committee, the government, in line with the development of ecological tourism, construction of charm merrill development strategy, to create the best products in with euramerican amorous feelings forest tourism as the goal, has carried on the elaborate to * * * hebei construction planning, hiring of dalian municipal design institute of design have been carried out on the town, through the * * * hebei controlling detailed planning fulfilled all the legal procedures, into the legalization process, by the flag, the municipal peoples government as a key towns. * * * government in 2011 to a high starting point, high standard town planning area of 1.8 square kilometers, the planning area and reasonable functional partition, forming area, two hearts, two axis, the development pattern of five area, launched the first phase at the same time, the new land of 520 mu. Service for perfecting the urban functions, create a good city environment, the township government decided to strengthen infrastructure construction, 2012, the hebei district road, water supply and drainage, drainage around the city, lighting, landscaping, sewage treatment, garbage transit and public toilets were new, and because of the basic conditions at the initial stage, the project need capital of 155.9 million yuan. (1) road works The new road system will form the main road, the secondary road and the branch road network system. There are two main roads, 4,5984 square meters: one road, 18466 square meters: eight branches, 3,8074 square meters, with a capital of 26.15 million yuan. (2) water supply and drainage works We will improve the water supply and drainage network in the northern and northern areas, meet the needs of water and drainage, and lay the water pipeline 5,474 meters, with a capital

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档