地道凝土二衬施工(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
地道凝土二衬施工(国外英文资料)

隧道凝土二衬施工(国外英文资料) Therefore, the pouring velocity should be symmetrical according to the design perfusion velocity. When mixed with concrete, the water can form a low quality layer and reduce the uniformity and integrity of the lining. Second, the concrete surface will be injected with the water, which will form a blister on the template. As a result, the water supply is applied to the drain hole on the block board. The concrete filling of the top part of the f. The method of upward injection is better than the concrete filling, and can also be squeezed by the filling. The main part of the concrete perfusion in the vault is not to produce any segregation, no gaps in the corners, and a complete filling of the plug. As a result, the concrete is continuously perfusion and removes the slurry and air from the opening of the block. G. In order to really fill the vault part, the study USES high liquid concrete, high liquid concrete is self-filling, and the material is difficult to isolate. In addition, usually the concrete produces a pulp that creates a small gap behind the arch. The high-liquid concrete has virtually no slurry, and the void caused by the slurry is not present. H. The upward filling mouth is generally appropriate for the 0.75 m on the concrete side. The farther away the concrete is from the concrete, the more difficult it is to flow, and the area near the vaulted vault is prone to void. Therefore, it is best to be near the concrete side of the perfusion. In order to reduce the air in the space, it can be installed in the concrete side. I. when filled was interrupted by the accident, change the concrete flow, can produce a hole and the thickness is insufficient, so each module standby power, spare concrete mixer, etc measures must be taken to ensure the continuous pouring concrete. Concrete tamping Vibrating USES the attached type of concrete vibrator and artificial plug-in vibrating rod, car process under springing line above, springing line, springing lin

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档