- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
基坑开挖垂直挖方施工方案(国外英文资料)
基坑开挖垂直挖方施工方案(国外英文资料)
Construction of Beijing metro line 7 is built in 2008
After chemical station and station, the interval of excavation
Foundation pit excavation and support supplement
Editor:
The nuclear judge:
The trial batch:
China iron 12 group co., LTD
The department of management of the eighth line of Beijing metro line 7
October 23, 1992
one
Chapter vi excavation of the foundation pit
The ground excavation of the foundation pit
6.1.1 excavation principle
(1) the foundation pit excavation should be layered piecewise homogeneous symmetric, in the process of excavation mastering layered, step by step, symmetry, balance, limit five points, follow the vertical stratification, longitudinal section, after the first dig construction principle. Soil foundation pit excavation space and rate should be mutual coordination and temporary reasonable excavation slope during excavation of soil, step-by-step excavation length should not be greater than 25 m, excavation steps should not be greater than 2 m height or thickness, overbreak or owed. The excavation process is shown in figure 6.1.
Construction organization
The general deployment will be excavated at 6.1.2.1
The foundation pit earthwork is drawn up from the end of the northern end of the chemical station and the end of the excavation interval from the end of the excavation interval. Foundation pit earthwork vertical elevation according to the steel pipe support design is divided into three layers, each layer with a single net spray supporting height 2.0 meters, roughly divided into three layers. It has nine sublayers. Longitudinal sections, no more than 25m. According to the excavation process, the steel pipe support is installed in time, and the steel pipe support is applied in time. The excavation method is illustrated by the excavation of the foundation pit.
The two CAT320 excavators are deployed to excavate the earth, one small excavator and the unearth operation. The central longitudinal trough is used as a me