网站大量收购独家精品文档,联系QQ:2885784924

浅埋小间距公路隧道施工步距优化研究.pdf

浅埋小间距公路隧道施工步距优化研究.pdf

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
浅埋小间距公路隧道施工步距优化研究

Civil Engineering and Technology September 2014, Volume 3, Issue 3, PP.46-51 Optimization Study on Construction Step of Shallow Buried Highway and Small Spacing Tunnel # Xiaoping Guo , Fengxia Yin 1. Weinan Zhengmao Blasting Engineering Co. Ltd., Weinan City, Shaanxi Province, 714000 2. Tianjin Zhongtian Jiayue Engineering Design Co. Ltd., Tianjin, Hebei District, 300000 #Email: zclky78@163.com Abstract Zhonghecun tunnel design for dual three lane tunnel, single tunnel width 5m,height 16.5m, left, right tunnel is 12M, in the process of excavation using 3 step excavation, overlying rock is weathered mudstone to sandstone, rock cover thickness is about 12M, the integrity and stability of rock mass difference. In the process of hole digging, the parallel construction, construction caused the deformation and failure surface, cracks between left and right images tunnel rock wall produced a parallel to the tunnel axis direction, in order to ensure the smooth excavation tunnel. Need to step on tunnel around the amplitude distance optimization. The three-dimensional finite element of three kinds of different construction step away from the stress and displacement of numerical simulation, the simulation results show that: with the increasing construction step, the surface deformation and decreases linearly, the construction step distance of 0, 10, 20 and 30m, the crown settlement are 90mm 30mm, 50mm, and 27mm. When the construction step is larger than 20m, less influence of construction of adjacent tunnel. Through on-site adjustment, determine the construction step distance is 20m, the height is within 30mm, which can ensure the safety of the tunnel construction, the mech

文档评论(0)

xxj1658888 + 关注
实名认证
内容提供者

教师资格证持证人

该用户很懒,什么也没介绍

领域认证该用户于2024年04月12日上传了教师资格证

1亿VIP精品文档

相关文档