上游连接段施工工法(国外英文资料).docVIP

  • 13
  • 0
  • 约1.88万字
  • 约 18页
  • 2017-06-08 发布于河南
  • 举报
上游连接段施工工法(国外英文资料)

上游连接段施工工法(国外英文资料) Upstream connection section construction method 1 the earth Ming dig The earthwork excavated the construction procedure Mechanical approach Build the transport lanes Mechanical inspection test run Soil transportation Vegetation clearing A simple drain is built Measurement, lofting Construction preparation The next working procedure The quality of the visa Soil transportation Earthwork excavation Abandon dross field stacking Abandon dross field stacking Bring the earth to the landfill Earth excavation method of excavation 1.2.1 construction release According to the construction design drawings, use theodolite or total station released excavation line, along the central axis tag set the top pile (the same as the original ground line measuring pile number), and the cord or lime, mark each tag pile elevation according to the drawings, please supervision engineer acceptance, subject to consent by the supervision engineer to make the construction of next working procedure. 1.2.2 clean up Using T140 bulldozers, 1 m3 hydraulic excavator cleared in excavation engineering area all roots of a tree, grass, garbage, culm and supervision engineer think of other organic matter, and dig the surface soil. 1.2.3 earth excavation The earth excavation mainly USES 1m3 excavator to excavate, 10t self-discharging car transportation. Because of earthwork excavation section is larger, earthwork excavation depth is deeper, so adopt stratified excavation, available soil and waste soil material shipped to the designated place, each in dump trucks through the dam crest stacked, mechanical excavation is not around, combined with artificial excavation trim leveling. Before the excavation, detailed understanding of engineering geological structure, topography and hydrogeology condition, on May cause landslides and collapses shall promptly take effective preventive measures. Under the steep incline, the stability of the slope should be carefully checked and properly cleaned and su

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档