塔式起重机四方验收表(国外英文资料).docVIP

  • 39
  • 0
  • 约3.3万字
  • 约 9页
  • 2017-06-08 发布于河南
  • 举报

塔式起重机四方验收表(国外英文资料).doc

塔式起重机四方验收表(国外英文资料)

塔式起重机四方验收表(国外英文资料) The four-way crane of tower crane is approved The name of the project New wu-zhou branch command center Equipment model QTZ80A Equipment serial number G10138 The manufacturer Zhejiang deying construction machinery manufacturing co., LTD Manufacture date On November 1, 2011 Design height 65 m Install the unit Fujian south China equipment leasing co., LTD Certificate number B3174035010203 The acceptance level 24.8 m Detection unit Fuzhou huizhou construction equipment technology co., LTD Test report number TJ - 201412291. Inspection conclusion qualified The serial number project Acceptance of the content Acceptance opinion conclusion one basis (1) the foundation meets the requirements of the basic drawings. The basic design has the data of soil bearing capacity and calculation. (3) after the foundation is finished, the inspection and acceptance procedure shall be completed and the strength of the concrete shall be reported. Meet the requirements 2 Amplitude limit The crane should be equipped with a range limit and reliable, and the terminal buffer should be installed. The crane of the movable arm should set the low position of the arm frame and the high position margin limit switch and the device that prevents the arm frame bounce back. reliable 3 since l high The degree of limit The lifting height limit for the limit position on the lifting hook should be installed and reliable reliable 4 Turn back to limit system device The crane that does not set an electric appliance on the turning part shall be installed with the rotary limiter and reliable. reliable 5 mark Fixed product signage and production permit signs in obvious position: control indicator signs, warning signs, and main performance parameter charts in obvious locations. In the vicinity of all handles, handwheels, buttons and pedals, there should be a marked indication of purpose and direction of operation. Crane performance signs should be installed in the drivers room. Meet the requireme

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档