塔式起重机装置前检查表(国外英文资料).docVIP

  • 3
  • 0
  • 约6.5万字
  • 约 16页
  • 2017-06-08 发布于河南
  • 举报

塔式起重机装置前检查表(国外英文资料).doc

塔式起重机装置前检查表(国外英文资料)

塔式起重机安装前检查表(国外英文资料) Check the table before installing the tower machine Tower crane models: __________________ tower crane number: __________________ project name: __________________ Install units: __________________ unit using: __________________ inspection date: __________________ The serial number Check the project The content and requirements The results of note one The steel structure No distortion, distortion, crack, and severe rust 2 Connecting pieces, fasteners The pin and bolt nuts are correct, the quantity is complete, the quality meets the design requirements. The specification of the set of cotter or card is in accordance with the requirements 3 Wire rope and its consolidation The wire rope is in line with the requirements of gb5972-86, and the wire rope consolidation meets the requirements of jgj33-2001 4 brake The brake band (block) wears no more than one half of the original thickness, the clearance meets the standard requirement, the normal action, and the protective cover 5 Safety device All safety equipment should be complete and in good condition 6 The hydraulic system Good oil and adequate measurement The tubing and pipe joints are in good condition and the balance valve is connected to the cylinder 7 Electrical system Maintain a good condition and work normally 8 The scene situation The installation site should be equipped with the condition of safety installation tower Check the opinion Check the people Installation unit technical director: use unit equipment manager: Installation captain (team leader) : installation unit safety (quality) : Other inspectors: The basic acceptance report of the fixed tower machine Tower crane models: __________________ tower crane number: __________________ project name: __________________ Install units: __________________ unit using: __________________ inspection date: __________________ The serial number content Required standards The measured note one Base station endurance 2 Based on concrete label 3 Foundat

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档