低压无功补偿的概念(国外英语资料).doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
低压无功补偿的概念(国外英语资料)

低压无功补偿的概念(国外英语资料) I. The concept of low voltage reactive power compensation Low voltage reactive power compensation refers to the installation of compensation devices in the low-voltage (380) 400 volt network of distribution transformers, including random compensation, servo compensation and tracking compensation. Random compensation: the random compensation is to connect the low voltage capacitor through the fuse and the motor, and then switch the protection device and the motor at the same time. Follower compensation: following the compensator, the low voltage capacitor is fixed through the fuse and connected to the low voltage side of the distribution transformer to compensate for the excitation and magnetic leakage and reactive power losses of the transformer. Tracking compensation: tracking compensation refers to the reactive power compensation, switching and cutting device as the control and protection device. The low voltage capacitor bank is connected to the 400 volt bus of the large user. This method of compensation is equivalent to the function of follower compensation. Select several groups of low voltage capacitors as manual or automatic switching to compensate the reactive load in the 400 volt network at any time. Two. Analysis of reactive power load in rural power network In our existing 10 thousand volt transmission system, it is often a line with several or more than ten or even two or thirty capacity transformers. Because the user is scattered, transformer capacity is small, the following 75 thousand KVA transformer accounted for more than 70%, and most of the transformer every day nearly 15 hours to no-load operation, running between the minority in the rated capacity of 20% to 40%, when the planting or harvesting season, will appear unbalanced reactive power. In the above network status, the original rural network users, 10 thousand volts line sending end or distribution, transformer users are not equipped with compensation device, resulting in 1

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档