- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
固井知识(国外英语资料)
固井知识(国外英语资料)
The theory of knowing
Drilling knowledge
The use of specialized tools and equipment to continuously crush rock to form a borehole is called drilling.
(1) drill bit
A drill is the main tool for breaking rock.
(2) drilling
The composition of the drilling is different with the drilling conditions and methods.
Drilling is an important tool for high quality, safety and quick drilling. It is the hinge between the ground and underground.
The drilling quality mainly includes the damage degree of the oil and gas reservoir, the well bore quality, the coring recovery rate, the well completion and the cementing quality and so on.
The drilling fluid for production is a water-based clay drilling fluid configured with clay and water.
The quality of the well is the deviation between the inclination of the borehole axis and the design of the well.
The completion method mainly refers to the method of determining the connection between the production layer and the bottom hole and the well structure after a well is drilled.
(1) open hole completion method
The open hole completion method can be divided into pre open hole completion method and later open hole completion method.
The pre open hole completion method is to drill down the oil pipe casing to the top of the production layer before drilling through the production layer.
In the latter stage, the open hole method is to lower the oil casing pipe to the top of the reservoir after drilling through the production layer.
(2) perforation completion;
Perforation completion method is the most widely used method of completion at home and abroad. Its essence is drilling, the casing to the reservoir bottom cementing, perforating and then shot through the casing and cement sheath and shells into the production layer in a certain depth, so oil and gas can be formed by perforating holes into the well.
(3) liner completion method
The liner completion method is to carry out cementing operations on the top of the oil pipe casing to th
您可能关注的文档
最近下载
- 农业推广学复习思考题答案.doc VIP
- 苏S13-2022 预制混凝土排水检查井.docx VIP
- 河南省南阳市六校2021-2022学年高一上学期第一次联合测试地理试题.pdf VIP
- 微早读 高一语文激情早读(必修下)第5周第3次(编辑版).docx VIP
- 人力资源管理专科毕业论文模板.docx VIP
- 衰老相关心脑血管疾病的机制与抗衰老干预策略.pptx
- 氢燃料电池的电力转换效率.docx VIP
- 应征入伍服兵役高等学校学生国家教育资助申请表1(样表).docx
- 医学生乙型病毒性肝炎防控知识和乙型病毒性肝炎疫苗接种意愿调查问卷.doc VIP
- 摄影与摄像技艺基础全套教学课件.pptx
文档评论(0)