- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
机、炉、电、化开停机过程中的工作安排(国外英语资料)
机、炉、电、化开停机过程中的工作安排(国外英语资料)
Work arrangement in the process of machine, furnace, electricity and chemical shutdown
Steam turbine operation
First, the boot work arrangements:
1., the value of a long command issued to the ignition before the boiler:
The turbine monitor should first check the unit work ticket has no effect on the end of the work; check the turbine in standby, oil quality, the oil level is normal; test the test manual on boot completed normal; lubricating oil and seal oil, EH oil, water, compressed air, cooling water, open and closed water, condensate water, water supply, auxiliary steam system start-up operation; the turning gear is in normal operation (hot start running less than 4 hours); vacuum was about -40kpa; the main parameters of the turbine before starting copy.
2. boiler before ignition to flushing before turning:
The bypass system, drainage system and platoon system; small oil recovery system; water level plus side; confirm except low vacuum, machine jump outside the furnace all the remaining host protection were put in; check the turbine body and the metal temperature of steam pipeline pumping vacuum normal, maintain 60 ~ 80kpa.
3., before the turn, before the grid:
Check turning and pump shaft automatic shutdown; low input and low cylinder steam side; automatic water input; start-up oil cooler water pump; valve switch and rated speed under normal brake; check the turbine vibration, axial displacement, differential expansion, expansion of the normal.
4. after grid connection:
According to the rules of load, high investment, and the steam side steam pump, to conduct a comprehensive inspection of the turbine system; input machine jump furnace and low vacuum protection.
Two 、 work arrangement before shutdown:
1. try to launch the AC and DC pump, low pump, pump shaft machine, turning motor no-load start, normal outage.
2., the auxiliary steam source is poured to the adjacent machine and the partition screen, and the valve control mode is cut to
您可能关注的文档
最近下载
- 一种窄冠带条多层缠绕搭接量计算方法及应用.pdf VIP
- 2025年融媒体中心全媒体记者招聘考试笔试试题(附答案).docx VIP
- L10010022《病理学》课程标准.pdf VIP
- 【必备收藏】幼儿建构区游戏指导完整版课件-.pptx VIP
- 主题策略-【专题报告】CANSLIM4.0策略:叠加企业生命周期.docx VIP
- 最新人教版九年级化学演示、分组实验统计表.xls VIP
- GB 50797-2012 光伏发电站设计规范.docx VIP
- 插画设计-PPT课件(全).pptx
- 古代牝户手抄本雨花香PPT课件.pptx VIP
- 【大单元整体教学设计】人教版初中化学九年级上册 第三单元物质构成的奥秘 课题1 分子和原子.doc VIP
文档评论(0)