- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
3.施工部署(国外英文资料)
3.施工部署(国外英文资料)
3.1 partial project construction sequence
3.1.1 road works
(1) construction of the road foundation
(2) base level. The order of construction of the base
3.1.2 bridge project
(1) construction of bored pile
(2) construction of the platform
(3) construction of columns
Construction beam construction
(5) erection of Bridges
The division and power arrangement of the running water section
Section 3.2.1 construction running water segment
According to the engineering characteristic of this project, the construction condition and the principle of combining the flow of water are arranged. The specific water segments are listed in table 3-1.
Construction force arrangement
(1) soft base processing
Two construction teams are committed to the soft base processing of this section. The machine is equipped with four machine and diesel vibrator, and the other machine is cooperated with the foundation engineering. More than 50 people were involved in the construction.
(2) the road foundation is filled in
Put into three construction teams, be responsible for the cleaning of the subsection of the subsection. The construction task of the dust reclamation of the roadbed.
The first construction team was responsible for the K22 + 150 ~ K23 + 980 section, with a total length of 1830 meters and a total of 138,000 cubic meters. Equipped with self-propelled vibratory press machine, three roller steamers, two bulldozers, one platform, one platform, one rotary machine and three excavators.
The second construction team was responsible for the K23 + 980 ~ K24 + 446 and the shanghai-tai-li ramp, which has a total length of 1819m and a total of 122,000 cubic meters of earth. Equipped with self-propelled vibratory roller platform, three roller steamers, two bulldozers, one rotary tiller and one excavator.
The third construction team is responsible for the K25 + 130 ~ K26 + 900 operation section, with a total length of 1770m and the earths 210,000 cubic meters. Equipped with self-propell
您可能关注的文档
最近下载
- 2025年秋人教版英语八年级上册Unit 1 Happy Holiday 教案教学设计.docx VIP
- 消除“艾梅乙”医疗歧视-从我做起!.pptx VIP
- 《饮用水源保护区》课件.ppt VIP
- 2025医疗器械偏差管理规程.docx VIP
- 三、功(教学课件)物理苏科版2024九年级上册.pptx VIP
- 2025年巩固拓展脱贫攻坚成果同乡村振兴有效衔接总结15篇 .pdf VIP
- 糖尿病合并高血压患者管理指南2025解读.pptx
- 石家庄空港工业园规划.pptx VIP
- 以中国式现代化全面推进中华民族伟大复兴PPT新时代坚持和发展中国特色社会主义的目标任务PPT课件(带内容).pptx VIP
- 大数据分析师(高级)试题(含答案).pdf VIP
文档评论(0)