中国联塑 pvc管道安装施工方案(国外英文资料).docVIP

中国联塑 pvc管道安装施工方案(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
中国联塑 pvc管道安装施工方案(国外英文资料)

中国联塑 pvc管道安装施工方案(国外英文资料) Construction considerations 1, pipe installation before construction, should meet the following conditions: first, design drawings and other technical requirements is complete, correct construction scheme and construction organization has to be confirmed and implement; Second, construction materials, construction tools and equipment are ready to ensure normal construction. The construction personnel are required to carry out the construction according to the design requirements, and the approval document of the design unit must be modified when the design is modified, and the unauthorized alteration of the design should be strictly prohibited. 3, before construction, should be acceptance of the material quality, specification and quantity of products should comply with the standard of product, the product has quality inspection department certification, fittings and pipe model matching. 4, PVC -u feed water pipe and other horizontal interval between adjacent piping should not be less than the construction and maintenance requirements of slot width and set the width of the gate shaft ancillary structure requirement. The horizontal distance between the high temperature pipe and the high pressure gas pipe, such as the hot water pipe, should not be less than 1 and 5m. Drinking water pipes shall not be laid under drainage pipes and sewage pipes. The horizontal distance between the line of PVC and the outer wall of the building and the outer wall of the building should not be less than the following: it is said that the outer diameter dn is not greater than 200mm and is 1, 0 m; The nominal outer diameter dn is greater than 200mm for 3 and 0 m. PVC - U pipes shall not pass under the building. When necessary, reliable protective measures such as extra casing should be taken. 7, when the design without rules, PVC -u pipe shall not adopt 360 ° full package concrete of foundation treatment or enhance pipeline carrying capacity. 8, buried under the roa

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档