家装隐蔽工程的验收(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
家装隐蔽工程的验收(国外英文资料)

家装隐蔽工程的验收(国外英文资料) We put 10 centimeters of water in the room, and we have to make sure that the water is highly labeled. Third step, 24 hours after acceptance personnel to observe whether the water height is changed, and also check whether the ceiling of the room downstairs in the same position in water seepage phenomenon; In the fourth step, if there is no such phenomenon, the inspection and acceptance personnel may consider the construction of waterproof construction to be acceptable; On the other hand, if the above phenomenon is detected by examination, it is considered that waterproof construction is not up to standard. If the acceptance fails, the waterproof project must be redone, and the acceptance shall be re-examined. For light wall waterproofing construction of acceptance, should be taken to drench water test, which USES water in well waterproof coating on the metope of top-down uninterrupted spray for 3 minutes, 4 hours, observe whether the other side of the wall will appear osmosis phenomenon, if no infiltration phenomenon appear to think metope waterproof construction acceptance. Tip: the first step on the ground is what we call a closed-water test. Since light body wall is prone to leakage, and routine check is easy to miss, it must also be waterproof. The acceptance of the noil distribution project: The acceptance of waterproof project, in order not to let the water leaking out, and power distribution lines of acceptance in order to make clear, not appear short circuit and open circuit phenomenon. The acceptance personnel should check the following items in order of priority: Whether the various materials used in the design conform to the design requirements; Whether the line is fixed; (3) whether the line connection is strong; 4, does the wire have a connection and the joints are strong? If there is a connection between the cable and the cable, if there is a connection, it must be replaced, or use a splitter in the receiver. If there is a connection

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档