济南黄河铁路新桥历史(国外英文资料).docVIP

济南黄河铁路新桥历史(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
济南黄河铁路新桥历史(国外英文资料)

济南黄河铁路新桥历史(国外英文资料) The Yellow River road bridge in jinan is located in the northern suburb of jinan city, shandong province, about 2km from the newly-built ziqing expressway. The bridge has a total length of 2033.44 m, including 488m main bridge, which is a continuous prestressed concrete double tower cable-stayed bridge for 5 holes 40 + 94 + 220 + 94 + 20 (m). The bridge length is 1535.44 m, and the prestressed composite channel beam with a prestressing force of 51-30 m span is adopted. The bridge is 19.5 m wide, including 15m on the roadway and 2m on each side. The main beam section is a closed two-room box girder, and the beam is 2.75 m high, and the hanging basket is suspended. Bridge structure The bridge tower is A type A type solid structure, the tower is 68.4 m, the tower beam is separated, the tower block is consolidated. The line is shaped by a sector, which is 8m, with 11 pairs of cables per tower. Each line is composed of 2 ~ 4 bundles, each with 67 ~ 121 Φ 5 of galvanized steel wire, with lead shielding casing pressure slurry. The anchor head of the pull is the anchor of the cold cast. Built in 1982. New bridge and the bridge The beijing-shanghai railway crosses the Yellow Rivers railway bridge. There are old Bridges and new Bridges. The old bridge, which is about seven kilometers north of jinan in shandong province, crosses the Yellow River between the jingkou station and the mountain station of the beijing-shanghai railway and the huang-river bridge. The bridge was opened in July of 1909 (the year of the qing dynasty) and was completed on November 29, 1912. The length of the bridge is 1255.2 meters and the girder is 9.4 meters wide. The bridge has 12 holes, nine of which are 91.5 meters, and the other three holes are the cantilever girder of 128.1 meter anchor span, 7.45 meter cantilever and 109.8 meters of holes. The bridge pier is built on the fine sand layer, the foundation adopts the pneumatic caisson and reinforced concrete pile foundation. The n

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档