- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
砖基础砌筑(国外英文资料)
砖基础砌筑(国外英文资料)
Foundation brick masonry
1 scope
This technological standard applies to the basic masonry construction of brick and exterior bricks of general industry and civil construction.
Construction preparation
Materials and main tools:
2.1.1 bricks: the variety of bricks, the strength grade must conform to the design requirement, and the specification is the same. There are factory certificate and test list.
2.1.2 cement: for Portland cement and Portland cement.
2.1.3 sand: medium sand, should pass 5mm aperture sieve. Make up the mortar with less than 10 percent of the mud. M5 and above mortar, sand is less than 5 percent of the mud, and it must not contain grass root and other debris.
2.1.4 mixing material; Stone plaster, powder coal ash and ground lime powder etc., the powder of lime powder should not be less than 7d.
2.1.5 other materials: drawing, burying, waterproof powder, etc.
2.1.6 main equipment: should be equipped with mortar mixer, shovels, froe drops, system board, wire, steel tape, brick, grey tank and a small bucket clip, string cable, sieve, brooms, eight clip on foot plate, steel and iron float, etc.
2.2 operating conditions:
2.2.1 base slot: the concrete or gray soil foundation is completed and the procedure is completed.
2.2.2 has already laid the basic axis and the border line; Set up the leather number rod (usually 15 ~ 20m, the corner should be set up), and complete the examination procedure.
Then according to the number of skin stem bottom elevation of the bottom layer of brick, drawing check foundation pad surface elevation, such as brick horizontal mortar joint of the first layer is greater than 20 mm, should be with fine stone concrete leveling, it is strictly prohibited in the masonry mortar mixed with fine stone to replace or pad with mortar, more not allowed to cut down a brick zygote leveling.
The clay bricks must be watered the day before the masonry, and it is advisable to dip the water into the four sides of the brick.
2.2.2.5 mo
您可能关注的文档
最近下载
- 卫生部卫妇社发〔2012〕35号《托儿所幼儿园卫生保健工作规范(2012年修 .pdf VIP
- 教科版五年级上册科学教学计划.pdf VIP
- 2025中国中医科学院中医药健康产业研究所 (江西中医药健康产业研究院) 招聘事业编制人员18人考试备考试题及答案解析.docx VIP
- 职业生涯规划课件(课件-43张).ppt VIP
- 江南嘉捷扶梯说明书MPS-200B.pdf
- 桥梁桩基设计与计算.ppt
- 10-fluent湍流模型汇总.ppt VIP
- GHS危险化学品安全标签中文英文模板及警告图标.doc
- 2025中国中医科学院中医药健康产业研究所 (江西中医药健康产业研究院) 招聘事业编制人员18人备考练习题库及答案解析.docx VIP
- 2025年通用技术集团校招正式启动笔试参考题库附带答案详解.doc
文档评论(0)