网站大量收购独家精品文档,联系QQ:2885784924

系统集成项目管理工程师练习三(国外英文资料).doc

系统集成项目管理工程师练习三(国外英文资料).doc

  1. 1、本文档共14页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
系统集成项目管理工程师练习三(国外英文资料)

系统集成项目管理工程师练习三(国外英文资料) In this paper, by janiphen contribution Doc documents may have a poor browsing experience at the WAP end. It is recommended that you choose TXT, or download the source file to the native view. (1) is not a key technology for J2EE. B.R MI/IIOP (4) A.J SP (2) is a professional modeling language. A.X ML B.U ML C.a. SP D.E JB C. c + + D.J AVA (3) is the process method of information system development. A.E GP B.R UP C.R IP Db GP The 802.11 standard defines three types of physical layer communication technologies, and these three technologies do not include (4). A. direct sequence spread spectrum, frequency hopping spread spectrum c. b. narrowband microwave d. diffuse infrared in December 2005, the ISO formally issued (1) as the international standards of IT service management; In October 2007, the ITU accepted the 3G standard. In October 2005, ISO officially issued the international standard for information safety management. (5) A: the iso20,000 B. Iso20,000 B. Iso20,000 B. The a.rsa algorithm is A symmetric encryption algorithm. The c.rsa algorithm can be used for some digital signature scheme The operation of the b. RSA algorithm is faster than the DES slowd.rsa security is based on the difficulty of decomposing the elements The following is not part of the middleware technology (7). The scope of the shutdown should be explained and the conditions, time, and possible resumption of work. The total supervisory engineer is given a work stoppage to the contractor, and after the signing of the contract, the photocopy of the photocopy is attached. Notification letter b. a. consultation supervision c. inform d. engineering progress report low awarded the power of supervision unit, the owner should be clearly reflected in (9), on the basis of project supervision institutions to carry out supervision activities. Outline c. a. b. supervision contract supervision supervision planning d. low supervision plan on account of the project life cycle and product

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档