二级建造师《水利水电工程管理与实务》中时间和数据统计(国外英文资料)
二级建造师《水利水电工程管理与实务》中时间和数据统计(国外英文资料)
Water conservancy and hydropower project management and practice in the relevant time and data
A level of water conservancy and Hydropower Engineering (permanent hydraulic structures are divided into five grades)
The scale of engineering grade???????? a total capacity of M3???? (MU) to protect farmland waterlogging???????? irrigation water???????? the installed capacity (kw)
1???? (big 1)???? 1 billion???? 5 million???? 2 million???? 1 million 500 thousand???? extra??? 1 million 200 thousand?
2???? (big 2)???? 1 - 1 billion???? 100-500???? 60-200???? 50-150???????? 30-120 million
3???? and???? 0.1-1 million 30-100 million???????? 15-60???? 5-50???? -???? 5-30 million
4???? small (1)???? 0.01-0.1 million 5-30 million???????? 3-15???? 0.5-5???????? 1-5 million
5???? small (2)???? 0.001-0.01 million???? 5???? 3???? 0.5??????? 10 thousand?
Two. Beware of the level (flood return period)
1 grade (100 years) 2 (50-100) 3 (30-50) 4 (20-30) 5 (10-20)
Three. Temporary hydraulic structure level (the highest level three, with many indexes and two items)
[level] [life]???? [high]???? [storage]
3???? more than 3 years???? 50m????? 100 million?
4???? 1.5-3?????? 15-50m?????? 0.1-1 million
5???? 1.5 years?????? 15m????? 10 million?
Four. [dam]
1. (70m) in high dam dam (30-70 meters)?? low dam (30M)
The 2. dam crest width?? (10 - 15m) low dam (5 - 10m)
The downstream level Four by 3. turf. The slope of 2%--3%. Wave (1 - 1.2m)
4. clay core wall and the inclined wall thickness at the top of the 3M, the thickness of the protective layer on the top of the anti-seepage and 1m
Five. [] 6m high embankment slope set back water carriage (width 1.5m) water side set wave platform (width 3M, height 1-2 times)
[six] sluice.
Integral plate thickness (0.5 - 0.7m, 1/5 - 1/7 times gate Kong Jingkuan);
Porous gate 20m
Upstream blanket thickness (0.2 - 0.4m)
Upper wing wall: gravity (5 - 6m), cantilever (6 - 9m) counterforted (8 - 9m).
The lower wing wall total diffu