建筑给排水毕业设计实习日志(国外英文资料).docVIP

建筑给排水毕业设计实习日志(国外英文资料).doc

  1. 1、本文档共21页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑给排水毕业设计实习日志(国外英文资料)

建筑给排水毕业设计实习日志(国外英文资料) Design and design internship journal for drainage and drainage The weather clears Wednesday, June 19 I went back to my dorm last night to study the drawing, and I saw that there were more than eleven o clock in my head. This is a technical extension project, the main content for building a factory self-provided power and chemical recovery project, size 36 unit project, the main factory building will commonly boiler room, transformer room, steam room, and connected to the coal gallery, chimneys, complex structure, high difficulty, is the core part of the project. In construction projects, there are also very simple bungalows, such as the instrument repair workshop and steel structure of the brick masonry structure. There are several underground reinforced concrete pools and two 45m (tall chimneys) one is reinforced concrete and the other is a brick chimney. Zhao said the project should aim for the winning bid. I would like to take part in the project after winning the bid, which is a great opportunity for me to study and exercise. Thinking about thinking, I became a hard hats, wearing overalls, standing on a scaffold, high quality checks of the builders practice, I find the scenery pleasing to both the toward the afar, suddenly blew a gust of wind, scaffolding and shake a few cast me into the air after I let out a cry woke up, it is a dream, just think back is full of cold sweat. The weather is cloudy on Friday, June 21 In the morning and zhao engineers go to the paper mill site for field inspection. Zhao said that before compiling the construction organization design (plan), there must be a field trip to the site, and it should not be taken for granted. Only after detailed understanding of the specific situation of the site, the design of the construction organization (plan) is not only targeted, but also has good practical value. Before leaving, zhao engineers asked me to understand the following main points: On-site power supply (line, capaci

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档