- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑设备工程技术实习日记(国外英文资料)
建筑设备工程技术实习日记(国外英文资料)
Monday, July 10th morning: sunny afternoon: clear average temperature: 25 ~ 36 degrees centigrade
Today is the first day to the site, because the site in prison, strict management, access to a few formalities, so also failed to enter the construction site, we have to wait a few days before entering the construction site, in recent days will first learn to do some within the industry. Today to find out the basic situation of some sites, the project is in Fuqing City, Fujian Province Prison No. 1, No. 3, No. 4, No. 5 prison dormitory expansion project (part of the transformation, the construction unit) in Fujian Province, Fuqing prison, design unit is min Wu Architectural Design Institute of Fujian Province, limited exploration unit is Fujian the provincial forestry exploration and Design Institute, supervision unit is Fujian Province Engineering Consulting Co. Ltd, the construction unit is Fuqing City show Fai Construction Engineering company. Covers an area of about 500 square meters, investment of about 3 million yuan, the duration of the project requires 270 calendar days, is a relatively small project.
Tuesday, July 11th morning: sunny afternoon: clear average temperature: 27 ~ 37 degrees centigrade
The import formalities have not yet handle clearly, can not enter the construction site, construction workers from morning to do some simple arrangements within the industry, the first task is to draw my internship in No. 3 dormitory expansion plan for each layer with CAD. The drawings looked simpler, and I agreed. But because the school did not open CAD this course, some basic CAD knowledge is taught, usually with CAD drawing less chance, so draw more slowly, but finally in the noon finished, after construction workers check, found many mistakes, some do not understand what the meaning of symbols like painting but the gourd is wrong. For example, the column symbol 21 (21A), the design instructions in the diagram indicate that the brackets represe
您可能关注的文档
最近下载
- 2025CSCO非小细胞肺癌诊疗指南2025.docx
- 第二节+串并联电路中电流的规律(教学课件)物理鲁科版(五四学制)2024九年级上册.pptx VIP
- 电信研发工程师L1题库.xlsx VIP
- DBJD25-67-2019 甘肃省建筑与装饰工程预算定额地区基价 不含税 中册.docx VIP
- 水生态产品价值实现路径.pptx
- 学习解读《中华人民共和国反不正当竞争法》课件(2025年新修订版).pptx VIP
- 数据架构、应用架构、业务架构及技术架构4A架构设计方案.pptx VIP
- 组合式空调机组运行调试使用及维护.pdf VIP
- 工程类邀请招标文件参考模板.doc VIP
- 电力内外线课题六 配电线路设备.ppt VIP
文档评论(0)