桥梁施工(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
桥梁施工(国外英文资料)

桥梁施工(国外英文资料) Bridge construction. TXT marriage is keyboard, too many order and rules; Love is a mouse. Men are more important than hosts. A woman looks like a monitor. Everything can be seen. DefAhtBie4Ksv4urPDi18l 1019736083 Bridge construction One, lower structure The construction technology of bored pile pile First, the application will be completed in writing. The report will be completed by the supervision engineer. The line is set at the base point of the conductor with the supervision engineers signature, and it is released using an infrared rangefinder. After the position of the post is released accurately, the post is buried, and after the check of the supervising engineer, the position of the pile is drawn out by the theodolite. The drill is drilled into the drill. The rig is first installed with the drill rig and lifting system and flattening the rig. The position deviation of the drill pipe must not be greater than 2cm, and the rotary plate is constantly checked in, such as tilting or displacement, adjust and correct in a timely manner. The drilling mud is made in the mud and stored in the mud pool. Check the aperture and verticality in the drilling process. Clearance hole: after the drilling depth meets the design requirement, inform the supervising engineer to inspect the hole, and immediately clear the hole. The cleaning method is used for the cleaning. [6] put a reinforcing cage: reinforcing cage of reinforcement in accordance with the design drawing class at the scene of the centralized blanking forming, according to the required length is divided into 2-3 day, reinforcing cage welding firmly, hanging hole, main reinforcement, stirrups position accurately. The height deviation of the cage is not greater than or minus 5cm. The submerged concrete is mixed with the water concrete, and the tanker is transported and delivered to the pipe. The catheter is first installed before perfusion. When installing a catheter, the connection bolts should be tightene

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档