钻井安全操作规程中英文.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
钻井安全操作规程中英文

1. Reeving on Drilling Line 1.1 Operational Requirements A. Pre-job meeting must be held before the reeving operations commence. B. Direct communication among all personnel is essential during this operation. C. The drawworks anchor clamp assembly on the fast line end must be changed out, as a whole, each time a new one is installed. D. Traveling block hanging strops and shackle, snake and safety harness must be inspected before this operation commences. E. All crew members working in derrick must wear safety harness. F. A visual inspection of the drilling line shall be done before the procedure commences. G. Check and ensure the proper size and specifications of the replacement drilling line. H. Avoid scrubbing the new drilling line against the derrick and the substructure. I. The new drilling line must be reeved onto the drawworks drum under tension. J. The new drilling line should never be allowed to touch the ground where dirt or sand could be picked up. K. Inspect crown sheaves for wear prior to installation of drilling line. Special care should be taken to ensure the drilling line is not kinked. 1.2 Reeving on Drilling Line from New Spool to Replace Existing Drilling Line A. Hang off the drill string in slips and install the Kelly cock (in the open position), on the drill pipe. B. Disengage the crown-o-matic. C. Hang off and secure the traveling block with the dedicated hang-off line. D. Cut off the excess drilling line from the old storage spool using the hydraulic line cutter; leave a sufficient length to attach a snake to the old drilling line. E. Remove the remaining drilling line from the old storage spool. F. Dismantle the drive chain from the old storage drum. G. Remove the old storage spool from the skid and install the new one. H. Thoroughly clean the sections of both the new and old drilling lines to be spliced with the snake, and remove any grease or oil (the snake line depends on friction to lock). I. Connect the old and the new drilling lines wit

文档评论(0)

shuwkb + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档