钻井安全操作规程中英文
1. Reeving on Drilling Line
1.1 Operational Requirements
A. Pre-job meeting must be held before the reeving operations commence.
B. Direct communication among all personnel is essential during this operation.
C. The drawworks anchor clamp assembly on the fast line end must be changed out, as a whole, each time a new one is installed.
D. Traveling block hanging strops and shackle, snake and safety harness must be inspected before this operation commences.
E. All crew members working in derrick must wear safety harness.
F. A visual inspection of the drilling line shall be done before the procedure commences.
G. Check and ensure the proper size and specifications of the replacement drilling line.
H. Avoid scrubbing the new drilling line against the derrick and the substructure.
I. The new drilling line must be reeved onto the drawworks drum under tension.
J. The new drilling line should never be allowed to touch the ground where dirt or sand could be picked up.
K. Inspect crown sheaves for wear prior to installation of drilling line.
Special care should be taken to ensure the drilling line is not kinked.
1.2 Reeving on Drilling Line from New Spool to Replace Existing Drilling Line
A. Hang off the drill string in slips and install the Kelly cock (in the open position), on the drill pipe.
B. Disengage the crown-o-matic.
C. Hang off and secure the traveling block with the dedicated hang-off line.
D. Cut off the excess drilling line from the old storage spool using the hydraulic line cutter; leave a sufficient length to attach a snake to the old drilling line.
E. Remove the remaining drilling line from the old storage spool.
F. Dismantle the drive chain from the old storage drum.
G. Remove the old storage spool from the skid and install the new one.
H. Thoroughly clean the sections of both the new and old drilling lines to be spliced with the snake, and remove any grease or oil (the snake line depends on friction to lock).
I. Connect the old and the new drilling lines wit
您可能关注的文档
最近下载
- 菲律宾结构设计规范NSCP chapter 1.pdf VIP
- 課程设计---四工位机床.doc VIP
- YAESU 八重洲 FT-8900R 四频段FM车载台 说明书.pdf VIP
- 2017年四川省成都市中考数学试卷及答案解析.pdf VIP
- HG_T 4196-2011 化学试剂 十水合碳酸钠(碳酸钠).docx
- 2024-2025学年小学科学四年级上册湘科版(2024)教学设计合集.docx
- 九年级美术上册第1课齐白石徐悲鸿备课岭南版.ppt VIP
- (高清版)DB32∕T 1702-2010 电力用户变电所运行规程 .pdf VIP
- 服装造型点线面.pptx VIP
- 十一自然资源配置.pptx VIP
文档评论(0)