- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
市政类二级建筑师模拟题(国外英语资料)
市政类二级建筑师模拟题(国外英文资料)
I. radio questions
Scene (1)
The structure of a road project is as follows: 7cm asphalt concrete pavement, 15cm thick cement stabilized macadam, 15cm thick 12% lime stabilized soil, 15cm thick 8% lime, improve soil cushion. In the excavation depth of 0.2 ~ 1m. During construction period.
Answer the following questions according to the scene (1):
1, the engineering subgrade excavation construction, it is appropriate ()
A must be based on the measurement of centerline and side pile excavation, generally on each side than the road width of 300 ~ 500mm
B excavation section shall not exceed dig, in subgrade design elevation following 600mm below the root and other debris, can not clear
C roller is not less than 8t roller
D Street rainwater branch construction should be in bed after rolling
Answer: A
2. when the soil moisture content reaches (), the compaction effect is the best.
A liquid limit
B optimum moisture content
C saturated water content
D plastic limit
Answer: B
3, the delay time of the stabilized gravel from the beginning of adding water to the full compaction is generally no more than ()
A3h
B5h
C6h
D3~4h
Answer: D
4, when the surface of the project is rolled, it is strictly forbidden to brush or spray on the roller
A water with laundry detergent
B diesel
C isolation agent
D anti adhesive
Answer: B
5, the options listed, belongs to the subgrade construction in rain season is ()
A the day after digging, filling, compaction, leaving no troubles
B how much, how much, how much, how much is it done?
C does not allow the lower layer wet construction, timely paving, timely completion of rolling
D in the field of construction a movable tent, so that the rain can continue to complete
Answer: A
Scene (two)
Bored pile foundation by a municipal overpass project, eight prismatic piers, superstructure span 25m post tensioned prestressed concrete box girder. The pile foundation mainly passes through gravel soil (gravel content less than 20% and particle d
您可能关注的文档
最近下载
- 数据科学导论—基于Python语言.pptx VIP
- 2024年秋季新教科版八年级上册物理全册教案.DOCX
- 管理会计(微课版)全套PPT课件.pptx
- 广东省八年级上学期物理期末试卷七套(附参考答案).doc VIP
- 消防法律法规(考试题库).docx VIP
- MWG-微观经济理论-译者曹乾-完整带书签合订版.pdf VIP
- 人教版2024七年级英语上册Unit1You and Me单元测试卷(含解析).docx VIP
- 2025年高校教师资格证之《高等教育心理学》试题及答案.docx VIP
- 苏科版九年级物理教学案全册.doc VIP
- 初中语文讲座:《素养导向初中语文大单元教学》课件.pptx VIP
文档评论(0)