数学(国外英语资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
数学(国外英语资料)

数学(国外英文资料) The excavation volume of foundation rock is large. 3, the engineering and concrete frame columns with C35 based on the top surface elevation between C30 to 2.750, with 2.75 to 5.55 level, more than the C25; beam, plate, slab, column, column, independent pull beam are made of C25 concrete, concrete wall by C15. The frame column has L, T and rectangle, and the special-shaped column template needs high installation. 4. The construction water is more convenient, and the existing water pipes for residents can be connected. Three, major economic and technological control indicators Serial number name index remarks 1, the quality of the project construction quality engineering, no quality accident, a pass inspection rate of 100%, Wudang cup 2 construction date, commitment calendar, construction period of 348 days, to ensure compliance rate of 100%, and strive to complete ahead of schedule 3 safety production, general accident frequency control within 1.5 per thousand, strive for Safety Production Award 4 civilized construction, civilized city construction site, to achieve the Hubei provincial standard of safety and civilized construction 5, measurement management to reach three levels of measurement standards 6 energy management monthly measurement, total control shall not exceed the plan 7 quality management self inspection, mutual inspection and delivery inspection 100% 8, the use of mechanical use rate of more than 90% 9, three tools turnover rate of 90% 10, reduce costs, strengthen measures to reduce consumption management costs, and strive to reduce costs 3--5% 11 steel consumption of 159 tons 12 cement dosage 1360 tons 13 wood consumption 132 cubic meters The second part is construction deployment I. organizational arrangements This project adopts the project law construction, and forms a field production command system with good management, good discipline and good style of work. Under the leadership of the project manager, a comprehensive management team

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档