- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
清单计价(国外英语资料)
清单计价(国外英文资料)
List valuation,.Txt always believe that there are many reasons for love in this world, but there is only one reason for separation - love is not enough. There are four books in life: health, affection, career and money. If the health disappears, other passbook will expire. I. earthwork and stonework
1, backfill compaction, volume preparation, rolling press after the quota of artificial, mechanical loose fill loose filling volume according to the quota system, other excavation, transport (including installation of loose soil loader) according to the quota volume of natural (NATURAL) preparation of dense.
2, leveling the site quota does not include digging roots, SOD and removing obstacles, when otherwise calculated.
3, the artificial excavation between the pile groups, soil manual times multiplied by the coefficient of 1:25, the amount of work calculated, the volume of the pile does not deduct.
4, the excavator in the pad on the operation, the corresponding quota manual and mechanical consumption multiplied by the coefficient of 1:25, and the cost of removing the pad will be calculated.
Key 5, groove excavation, site formation and division of general earthwork bottom width of 3m or less and the bottom length is more than 3 times more than by wide trench calculation; bottom area within 20m2 by in situ digging excavation calculation; thickness less than 30cm, according to the soil leveling calculation; the super range of soil and rock according to the general calculation of excavation or rock. The excavation of earth and the cutting of hillsides shall be made on the basis of the ground elevation. The above is hillside cutting soil, and the following is excavation earthwork.
Two. Brick and foundation engineering
1. The length of the pile in the name of the project refers to the length of the bottom of the pile to the level of the natural ground. The hammer weight refers to the design weight of the hammer.
2, send the preset square (pipe) pile to apply the c
文档评论(0)