上海通用PPP培训资料.ppt

  1. 1、本文档共18页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
上海通用PPP培训资料

Global Pre-Production Part Quality Process Global Pre-Production Process Owner: Bob Warner Global Pre-Production Process SME: Chris Fellin Global Materials and Program Management SME: BJ Lee Supplier Training Module Release Date: October 2008 Version: V1.0 Global Engineering Process Champion: Jay Reidsma /servlet/PeopleSearch?dn=gmPersonId=GW58257,ou=people,dc=gm,dc=comdisplaytype=person;Purpose The Pre-Production Part Quality Process (PPQP) is a General Motors global process that aims to: Assure that all parts meet dimensional and functional requirements as specified by General Motors. Commonize associated processes across Product Development, PPO and Suppliers globally Establish methods to assure that all parts are approved before shipment and installation ;Scope PPQP is a GM global process. PPQP applies to all internal and external Suppliers of Pre-Production parts to PPO Build shops. This includes, but is not limited to, GM Parts Fabrication, GM Metal Fabrication, GM Powertrain, and all non-GM Suppliers PPQP certification does not apply to PPAP approved parts. PPQP supersedes all previous processes governing inspection, certification and delivery of Pre-Production parts. PPQP replaces GP-11 (General Procedure #1820) for Pre-Production / Prototype parts supplied to the PPO Build Shops. PPQP does not replace GP11 for parts supplied to GM Powertrain Facilities globally nor Pre-Production parts supplied to GM Assembly Plants. ;Overview PPQP describes the requirements for inspection, certification and delivery of parts for use in Pre-Production builds. The PPQP classifies parts that are being used in Pre-Production builds into three categories: Prototype/Pre-production Critical parts Prototype/Pre-production Non-Critical parts PPAP Approved parts The category of the part and conformance to GM specifications determine approval requirements.;Critical Parts The process begins with the Dimensional Program Manager (DPM) leading developmen

文档评论(0)

mhk8089 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档