!!!操作系统全英文期末考试题(带答案).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
!!!操作系统全英文期末考试题(带答案)

XX大学2011 ——2012 学年第一学期 《 操作系统 》期末考试试题(A) 考试注意事项 考试 课程 考试时间 年 月 日 题号 一 二 三 四 五 六 七 八 总分 满分 得分 阅卷 教师 选择题(20分,每题1分) 1. Generally speaking, which one is not the major concern for a operating system in the following four options?( D ) A.Manage the computer B.Manage the system resources C.Design and apply the interface between users program and computer hardware system D.High-level programming language complier The main disadvantage of batch system is ( C ) CPU utilization is low Can not concurrent Lack of interaction Low degree of automation A process transforms from waiting state to ready state is caused by the ( B ) Interrupt event Process scheduling Create a process for a program Waiting for some events The concurrent process is refers to ( C ) The process can be run in parallel The process can be run in order The process can be run in the same time The process can not be interrupted In multi-process system, in order to ensure the integrity of public variables, the processes should be mutually exclusive access to critical areas. The so-called critical area is ( D ) A buffer A date area Synchronization mechanism A program The orderly use of resources allocation strategy can destroy the condition ( D ) to avoid deadlock. Mutual exclusive Hold and wait No preemption Circular wait Users applications use the system resources to complete its operation by the support and services of ( C ) clicking the mouse Keyboard command System call Graphical user interface There are four jobs arrived at the same time and the execution time of each job is 2h. Now they run on one processor at single channel,then the average turnaround time is ( B ) A.1h B.5h C.2.5h D.8h Among the job scheduling algorithms, ( B ) is related to the jobs estimated running time. FCFS scheduling algorithm Short-job-first scheduling algorithm High response ratio algorithm Balanced scheduling In memory management, the purpose of using the overlay

您可能关注的文档

文档评论(0)

shuwkb + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档