- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
中心机房及配电系统设计(国外英文资料)
中心机房及配电系统设计(国外英文资料)
Center engine room and distribution system design
Orders to record
Center room and distribution system design 1
Machine room decorates design 1
The 1.1 project overview 1
Design basis and technical indicator 1
1.3 construction 2
1.3.1 activity floor 2
1.3.2 condole top 3
1.3.3 partition 4
1.3.4 metope, column 4
1.4 distribution system 4
Design basis: 4
1.4.2 distribution system 5
1.4.3 lighting system 5
1.4.4 electrostatic leakage system 6
1.4.5 ground network 6
1.4.6 distribution system capacity 6
1.4.7 fire and automatic alarm system 7
1.4.8 lightning protection system 7
Air conditioner 7
2, ground protection system (EP) 9
2.1 an overview of the 9
Design specification 9
The engineering design of 2.1.2 lightning and ground system is 10
The ground resistance is required to be 10
2.2 ground system 11
2.3 mine-resistant system 15
The roof of the roof is 15
2.3.2 is for electrical system 15
The thunder and equipment of the 2.3.3 signal system are equipped with 16
2.3.4 USES a lightning guard to note items 17
The weak electric lightning protection ground system design 18
The power line of 2.4.2 power equipment is 18
The signal line of 2.4.3 weak electrical equipment is 18
The dc ground of 2.4.4 weak electrical equipment is 18
The requirement of the base connect network is 19
3, UPS centralized power supply system. 21
Center engine room and distribution system design
Machine room decorates design
Explanation: the design scheme of this room is only for the preliminary design, not the research and discussion with the construction unit. This plan is based on my companys long-term experience in designing and building the machine room, and it is introduced with reference to similar specifications. The machine room selects material is medium and high grade, the design plan is for the construction unit reference borrows. After the research and investigation of the construction unit, we are willing to discuss with you to provide more accurate and feasible des