- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
发电机的试验要求(国外英文资料)
发电机的试验要求(国外英文资料)
4 test instrument with 4.1 meter sensor with sensor test instrument used by sensors should be certified by the department of measurement and in the period of validity, instrument with sensor test range, accuracy should be operator testing requirements and the provisions of the relevant standards instrument with the accuracy of the sensor shall be not less than 0.2 on the Richter scale are unlikely. 4.2 instrument test using instrument, shall be certified by the department of measurement and in the period of validity, the test using test range, precision instruments and meters in accordance with the test requirements and the provisions of the relevant standard. Test, adopt the accuracy of electrical measuring instruments shall be not less than 0.5 (with the exception of megger), and the accuracy of resistance measuring instrument shall be not less than 0.2, the accuracy of torque measuring instrument shall be not less than 0.5, the accuracy of tachometer shall be not less than 1.0 on the Richter scale, dynamometer of quasi 2 NB/T XXXX. 2, the accuracy of the x x x x should be not less than 1.0 (with the exception of hanging spring balance), and the error of the thermometer is not greater than soil l ℃. Test equipment and circuit should meet the requirements of the test. Before the test, participants generator should be in normal state, the connection is correct, try to be the generator assembly and check the running status, in order to protect the various test can run smoothly. The 4.4 safety measures, which involve dangerous current, voltage and mechanical force, should take safety precautions for all trials. All trials should be operated by a person with knowledge and experience. 5 pilot project 5.1 measuring 5.1.1 winding insulation resistance of casing and the determination of winding insulation resistance between 5.1.1.1 motor state measurement of the motor winding insulation resistance should be in real cold state and hot state machine (or) aft
文档评论(0)