地砖面层施工工艺(国外英语资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
地砖面层施工工艺(国外英语资料)

地砖面层施工工艺(国外英语资料) Floor tile surface construction technology I. main points of construction 1, the concrete floor should be the base chisel hair, chisel hair depth 5~10 mm, chisel hair mark spacing is about 30 millimeters. After the clean dirt, grease, mortar, producing scattered brush major ground water. 2, before the shop is stuck should play a good line, at right angles to the base line on the ground and began to pop up the doorway, play the line from the door, in order to assure the entrance for the whole brick, the whole brick in Yin angle or under the furniture, elastic thread should pop up freely positioning control. 3, paving ceramic ground brick before, should first be ceramic tile to soak dry up. 4, the shop is stuck, the cement mortar should be full with ceramic tile floor in the back, after the shop is stuck with a rubber hammer hammer. At the same time, use horizontal ruler to check and clean the surface cement mortar. 5, shop 2~3 hours after finishing, with white cement to wipe seam, with cement, sand, =1:1 (volume ratio) of cement mortar, seam to be filled with dense, smooth and smooth. Wipe the surface with cotton silk. Two 、 construction preparation (I) material preparation Floor tile, cement, sand, water, interface agent Uniform appearance, color, smooth surface, neat corners, no cracks, missing edges, corners and other defects Sand is medium sand or coarse sand, 5mm pore size sieve, its mud content is not greater than 3%. (two) equipment preparation 1.: mechanical sand mixer, desktop and portable wheel saw marble machine, angle grinder. 2. tools: rubber hammer, shovel, rake, trolley, sieve, bucket, scraping bars, wood trowel, iron trowel, greed, hammer, broom etc.. 3. measuring tools: level, scale, steel ruler, square, on foot, nylon line, level etc.. 4. safety protection articles: masks, gloves, goggles and so on. (three) working conditions; Indoor elevation control line (ten 500mm or + 1, 000mm) has been played well, large area construction shou

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档