工程进度时间管理.doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程进度时间管理

HYPERLINK /10.1016/j.autcon.2015.07.004AutomationHYPERLINK /10.1016/j.autcon.2015.07.004 inHYPERLINK /10.1016/j.autcon.2015.07.004 ConstructionHYPERLINK /10.1016/j.autcon.2015.07.004 58HYPERLINK /10.1016/j.autcon.2015.07.004 (2015)HYPERLINK /10.1016/j.autcon.2015.07.004 38HYPERLINK /10.1016/j.autcon.2015.07.004–HYPERLINK /10.1016/j.autcon.2015.07.00447 Contents lists available atHYPERLINK /science/journal ScienceDirect Automation in Construction journal homepage: /locate/autcon Real time progress management: Re-engineering processes for cloud-based BIM in construction Jane Matthews a, Peter E.D. Love b,?, Sam Heinemann a, Robert Chandler c, Chris Rumsey c, Oluwole Olatunj a a b c Department of Construction Management, Curtin University, GPO Box U1985, Perth, WA 6845, Australia Department of Civil Engineering, Curtin University, GPO Box U1985, Perth, WA 6845, Australia Aquenta Consulting, 8/197 St Georges Terrace, Perth, WA 6000, Australia a r t i c l e  i n f o  a b s t r a c t Article history: Received 14 February 2015 Received in revised form 13 May 2015 Accepted 11 July 2015 Available online 28 July 2015 Keywords: BIM Real-time monitoring Checklists清单 RC structure Object orientated work flows 1. Introduction  Having timely access to information on the performance of a construction project enables the design team and contractor to improve their decision-making so as to ensure project deliverables确保工程如期交付 are met. This paper examines the effectiveness of cloud-based BIM for real-time delivery of information to support progress monitoring and management of the construction of a reinforced concrete (RC) structure using action based research. To under- take this task, existing paper-based processes were re-engineered to accommodate the use of cloud-based BIM during construction. The design and implementation of a real-time object oriented bi-directional system, allowed information (e.g., the status of the ‘As-Built’竣工 sc

文档评论(0)

shuwkb + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档