项目施工节约题目及门路(国外英语资料).docVIP

项目施工节约题目及门路(国外英语资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
项目施工节约题目及门路(国外英语资料)

项目施工节约问题及途径(国外英语资料) Problems and ways of project construction saving Abstract: at present, speeding up the construction of economical construction enterprises under the background of the face of waste phenomenon in the project construction site construction and outstanding performance, the author of how to strengthen the project management of the construction site, the popularization and application of the four new results, improving the four section effect, as the construction of the project and solve the problem of saving way, carries on the beneficial discussion. Keywords: project construction saving four new section 1, the problem of Chinas construction industry is a pillar industry of the national economy, fixed assets of more than 50% of the community is through the physical form, transformation and completed by construction enterprises. The construction enterprise technology progress and the four new (new materials, new technology, new technology and new equipment), four day (section, energy, water and materials) application level effects in large programs and to determine the level of the whole development of the national economy and speed. The four new and four sections established by the state and the construction system are the key points in the construction of a conservation oriented society, as well as the bounden duty of construction enterprises. The construction enterprises in the construction of the project bear the consumption of resources, energy and raw material consumption index, grasp the application of construction technology, production, project management and international counterparts differ greatly and reflected in all aspects of the construction site. Gap, of course, indicates that the project construction site to carry out the four new and four sections of great potential, the effect of the big. Construction enterprises should focus on the construction of the project to focus on the construction of the project. Waste status and outstandi

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档