- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
风管的制作与安装(国外英语资料)
风管的制作与安装(国外英语资料)
U - shaped fixed card can be used for duct connection with many metal components, such as air, muffler etc.. Tapping screws can be used to secure the U shape cards and components.
(4) connection with round metal hose
Plate splicing
Because of the possibility of bonding plate, after cutting the narrow stitching after repeated use. The two part is cut into 45 degree side, adhesive bonding, and then aluminum foil tape affixed to the two narrow seam.
Installation methods and tools
The appropriate tools and engineering organization right and good construction practice can be installed a durable and stunning duct system. The following tools help to improve quality and efficiency.
construction organization
Field assembly:
(1) give each worker detailed drawings of the sections and fittings required for each zone or fan.
(2) ensure that the construction staff understand the requirements of standard pipe construction, especially that the original construction drawings are made of metal ducts instead of MDC.
(3) provide all the items for the correct installation so as not to replace them on the spot. Include:
Required adhesive tape, adhesive.
For reinforcement and installation, equipped with binding guns and mounting tools.
The device is connected, fireproof valve, hose connectors and other accessories for popular duct system design.
(4) ensure that the construction staff can:
Reduce loss and properly repair all damaged pipe sections.
Keep the duct well.
Make sure the assembled air duct is tight connected.
Assemble the largest number of pipe sections for lifting.
Lift and support the air duct at the correct intervals.
(5) all seams must be on one line. Changing the seam will cause incorrect duct alignment; the wind pipe will twist or rotate, indicating that the duct is not operating correctly when grooving or forming.
(6) check whether the pipe is properly connected and strengthened. Repair damaged pipe surface with permitted sealing material.
Construction to
文档评论(0)