网站大量收购独家精品文档,联系QQ:2885784924

特种工分类(国外英语资料).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
特种工分类(国外英语资料)

特种工分类 Classification of special workers Operation certificate of Safety Supervision Bureau (Safety Supervision Bureau) 1. electrical work (electrician) High and low voltage operation, installation, maintenance, duty, power generation, power distribution, etc.. 2. metal welding (cutting) operation: (welder) Welding, cutting, CO2 welding, argon arc welding, etc.. 3. refrigeration and air conditioning operation: (air conditioning) Installation, maintenance and operation of air conditioning. 4. climbing homework: High tech building demolition work timberman plug-in installation of high-altitude maintenance Comparison of operation types and items of special equipment operators The work items and codes stipulated in the 140 order correspond to the items in the original order No. 70 Job item code A1, head of safety management for special equipment A2, head of quality management of special equipment Boiler, pressure vessel, pressure pipe, safety management, A3, boiler safety management Safety management of pressure vessel Safety management of pressure pipeline Safety management of gas cylinder filling Elevator safety management A4 elevator safety management Safety management of hoisting machinery, A5 hoisting machinery, safety management Passenger ropeway; safety management; A6; ropeway; safety management Large recreational facilities safety management A7 large recreational facilities safety management Safety management of special motor vehicles in yard (factory) A8 A boiler G1 boiler operation Two boiler G2 Three boiler G3 Primary boiler water treatment, G4 water treatment operation Water quality treatment of two stage boiler G5 Boiler energy efficiency operation G6 Fixed pressure vessel operation, R1 pressure vessel operation Tanker filling in mobile pressure vessel filling R2 pressure vessel operation Oxygen oxygen maintenance maintenance R3 Filling P1 cylinders with permanent gas cylinders Filling of liquefied gas cylinders P2 Dissolved acetylene cylinders filled with

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档