- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
甲基丙烯酸的开车方案(国外英语资料)
甲基丙烯酸的开车方案
Starting steps
I. current status (late stage of methanol through transportation):
1 boiler, air separation, circulating water and chilled water system operate normally;
2. The level of each tower and reflux tank is normal. The temperature, pressure, flow rate, liquid level and other instruments are checked accurately and displayed normally;
3. The pump runs normally and the inlet screen is clean;
4, through the methanol intermodal drills, operators have been able to master DCS and external operation;
5, a step into the molten salt according to heating, heating up to 350~380? C, the normal operation test of molten salt system, hot melt salt discharged into molten salt tank reactor, natural cooling;
6. Once the catalyst is loaded, the purge air is blown continuously and kept dry.
Two and two counter unit feeding test
(1) methanol cycle: first, the methanol is pumped from the tank farm to the boundary area by methanol,
After MOH2025 MOH2010
MOH 2004-50, M1E
MMA-2019 MAR 2004-40 M1E
MMA2022 to MAR1010 (cross line)
R-201 open loop mixing, 24 hours after sampling, such as methanol is polluted by V-221 - C-220 - V-320 (E-310 C-220, MOHs vice line, 2201-65 M1B, LV2202 MOH, 2202-65 M1B, MOH 2203-65 M1B, MOH 3105-65 M1B-PP, MOH 3106-65 M1B, V-320), empty, re injection by V-202 fresh methanol cycle;
(2) until the methanol is qualified, the liquid level of R-201/A and D is reduced to 80%, the manhole is opened and the amount of catalyst is added, and the circulation system is debugged. (two filter system operation method). After the filtration system is functioning properly, proceed to the start step.
Three, preparatory steps
1, all involved in water transport towers, containers, heat exchangers, intermediate tanks, pipes, instrument systems put aside the net storage water (except C-330), including 200 systems (except C-220), outside the methanol pipeline dry with purified air;
2 all containers, intermediate tanks and tower bottom manholes shall be opened (except C-3