- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
百年电锁(国外英语资料)
百年电锁
And the quality of life of city residents to improve, for the load and the load center, power supply radius of low voltage distribution network gradually narrowing (downtown is not more than 100 meters) requirements, must be in the dense population and building density of commercial, economic and cultural center construction and distribution facilities, but the city center of the downtown area, cultural relics protection zone area, city planning departments have special requirements on the city landscape and overall environment, so the ground transmission and distribution facilities is very large, and the conventional ground box type substation caused by coordination with the surrounding environment, affecting the coordination environment of the city, city residents and tourists on the ground box is also quite critical, in addition to on the box construction in addition to expensive land, the demolition site difficult, irregular, difficult construction conditions etc. factor to the substation construction brought Many unfavorable factors. In order to solve the problem that the substation is not in harmony with the surrounding environment, the prefabricated underground box type substation products become a big demand of the power supply sector, and the construction of prefabricated underground box type substation becomes inevitable. The use of prefabricated underground box type substation can be arranged on the sidewalk, making full use of underground space, and all equipment installation was completed in a factory installation box only box part and the cover part of the hoisting, greatly saves the construction period. Thesis bar
Thesis bar
2. electrical part
Thesis bar
The prefabricated underground box is suitable for the electric load switch and the short circuit / ground fault indicator, and the transformer outlet is configured with a SF6 load switch fuse combination. The entrance and exit of HV cables are all down, down and out. Used transformer sealed oil
文档评论(0)