第四章 土石坝工程(国外英语资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
第四章 土石坝工程(国外英语资料)

第四章 土石坝工程 The fourth chapter, earth dam project This chapter focuses on the material planning and selection principles; the earthwork digging machine type and applicable conditions; the selection and calculation of excavating machinery supporting scheme; the dam work and some problems; the dam construction quality control. Among them, chapter four is the key and difficult point of this chapter. Section 1 planning of rock and soil yard This section focuses on the content and selection of the basic principles of material planning. The planning of the material yard is divided into time planning, space planning, quality and quantity planning, etc.. First, the planning of time The so-called time planning, that is to consider the construction intensity and dam filling site changes. With the change of season and storage condition before dam, the working condition of material yard is also changing. In the material planning, should strive to achieve high dam strength, with a close field, low distance materials field, so that the transport task is balanced. For the near material and upstream flood prone fields, the raw materials should be used after the raw materials and the refractory fields which are not easy to be flooded downstream. The water content field with high moisture content should be used in the dry season with low moisture content in the rainy season. In the material field used in the planning, but also part of the material field for use near closure section filling and Flood flood peak intensity. In addition, dealing with time and space will backfire. Two. Spatial planning The so-called space planning, refers to the location of the material yard, elevation of the appropriate choice, reasonable layout. On the distance of soil and stone dam as short as possible, the elevation is conducive to the heavy vehicle downhill, reduce the power consumption of transport machinery. The near material field shall not affect the seepage stability of the dam and the conveyance

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档