- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水电安装之电线管预埋作业指导(国外英语资料)
水电安装之电线管预埋作业指导(国外英语资料)
Instructions for the pre-buried work of the power line tube for hydropower installation
One,????? Job content
The terminal system of the junction box, the positioning of the measuring line, the drilling of the template, the welding bracket, the installation of the wire box, the installation of the pipe, and the protection of sealing
Two,??? Construction preparation
Materials preparation:
????? Before construction, the various materials and prefabricated parts required for each layer shall be calculated according to the detailed drawings of the construction, and the statistical table shall be set up to facilitate the supply of materials and the use of quotas.
The flame retardant PVC pipe should be used in the pre-buried concrete structure. It is required that the resistance to compressive resistance is good; The tubing should be flexible and flexible, and the bending is not easy to break, and the flexible construction electrician USES the non-plasticized rigid flame retardant PVC pipe.
Pipe, junction box, joint casing, lock, glue and other suitable products. The height of the outlet box for the hole spacing should match the distance of the steel bar and the template. The inner diameter of the sleeve and the lock should be closely matched with the outside diameter of the catheter.
The pipe and its accessories should be inspected in the field of entry. The PVC pipe should be evenly distributed, no deformation and bubble crack, etc., which requires the inspection report of fire products and the factory certificate, the oxygen index is greater than 27%. The connection box should be smooth and smooth. The pipe and connection box should have clear manufacturer name and trademark, specification type, and execution standard number.
Other materials:
Nails, wire, tape, sawdust, paint
2.????? Machinery and tools:
Hand electric drill, opener, cutting machine, saw blade, pliers, measuring tape, horizontal ruler, line drop, brush pen, red pencil
3.????? Tec
文档评论(0)