- 1、本文档共22页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2010年咨询师《现代咨询方法与实务》案例分析题精选(国外英文资料)
2010年咨询师《现代咨询方法与实务》案例分析题精选(国外英文资料)
In 2010, consultant, modern consulting methods and practices, selected case studies
case
A consulting firm received 2 business consulting, one is to fill the market gaps in the special steel plate processing project, one is a leading technology projects. Among them, the industrial processing project belongs to the scope of approval of the project, the enterprise is also prepared to accept the project after the evaluation of the Advisory task.
In the preliminary consultation, the market demand forecast should adopt the regression model for short-term prediction, and the elastic coefficient method is used for the near future prediction, and the exponential smoothing method is used for medium-term prediction.
The special steel plate processing project made a prediction of the demand for the special steel plate in 2010 by using the unitary linear regression. In 2009, the demand prediction of the special steel plate was 100 thousand tons. And Sy=0.9 is calculated.
Question:
1, please explain the main features and development ideas of the 2 projects
2, is the market forecast prepared to adopt appropriate methods?. Which method needs less historical data?
3 excuse me, according to probability 3. The principle of confidence is 95.4%, what is the range of 2010 special steel demand forecast?
4, the project approval application report, focusing on what content?
5, the enterprise can accept the post evaluation of the project business?
6, what is the success degree of the project evaluation after the evaluation?
Reference answer:
1, (1) to fill the gap of the market. The key to the effectiveness of project investment lies in the market. Especially in industrial processing projects, as long as the demand for large products, low production costs, there is a basis for profit. Those who can aim at market opportunities, use market gaps, plan investment projects, produce and operate products that meet the needs of the market, will be able to achieve
您可能关注的文档
最近下载
- 投标人对保证工程质量及详细的质量违约处罚措施的承诺;.doc
- 2023年深圳市南山区第二外国语学校小升初分班考试英语模拟试卷及答案解析.docx
- 华东理工大学《多元统计学》2020-2021学年第二学期期末试卷.pdf
- 主题班会成功无捷径 学习当奋斗(课堂PPT).ppt
- 习概 推进依法治国.docx VIP
- 安徽大学-2020-2021学年第-一-学期大学英语A试卷及答案.docx
- 常见创伤分类与现场急救(1).ppt
- DENON天龙AV接收机AVC-X8500H产品说明书.pdf
- 中学英语教研组校本研修活动记录.doc
- 河北工业大学2022-2023学年第2学期《高等数学(下)》期末试卷(A卷)附标准答案.pdf
文档评论(0)