- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
国家最新的 建筑面积计算规则 _360问_20141110_235012(国外英文资料)
国家最新的 建筑面积计算规则 _360问235012(国外英文资料)
The latest national building area calculation rules the new building area calculation rules building area calculation rules I. the scope of the building area is calculated
The 1 storey building, no matter how its height were calculated according to a layer, the construction area is calculated according to the level of the outlying area above the plinth of buildings. In a single building, such as those with a number of floors, the floor area should be calculated.
2, the level of the single span buildings, such as building area were calculated, when the high span side span, the construction area above the plinth gable ends of outer surface of the horizontal length multiplied by the walls above the plinth surface to the high cross in the outside of the column level line width
Calculation。 When the high span span, calculate the horizontal width of the construction area above the plinth gable ends by the outer surface of the horizontal line in the outside of the column length.
3, multi-storey buildings construction area is calculated according to the total construction area of each layer, the bottom wall at the building above the plinth peripheral horizontal area calculation, two layer and two layer above the wall by horizontal area calculation.
4, basement, semi basement, underground workshops, warehouses, shops, underground headquarters of the building entrances and the corresponding area by the upper wall (not including light wells, moisture-proof layer and protective wall) area of the external level calculation.
5, with deep foundation to make underground overhead layer to use, more than 2.2 meters high layer, according to the overhead layer of the horizontal area of half of the calculation of construction area.
6, the use of suspending buildings on hillside to be used to do overhead layer and the height of over 2.2 meters, the construction area at the level of peripheral area of enclosure.
7, through the corridor of the
文档评论(0)